  • Detail Information
  • Product Description

Detail Information

Color: Part A Is Iron Red, And Part B Is Colorless Transparent Liquid; After Mixing, It Is Iron Red Liquid. Shelf Life: 12 Months
Packing: Part A As 20kg/kit, Part B As 2 Kg/kit, Diluent As15kg/kit Key Words: Seal Primer,chimney,anti-corrosion
Feature: Three Part,Excellent Adhesion And Compatibility For Good Bonding With Most Substrates Material: Epoxy
High Light:

anti corrosion paint

,

heat resistant adhesive

Product Description

Seal Epoxy Primer Chimney Anti Corrosion Coating

 

Guibao 102 seal primer is the heat-resistant epoxy anti-corrosive primer. As sealing agent for the bonded surface, it has many functions of increasing bonding strength, blocking moisture and resisting acid corrosion.

 

Product Features

 

The seal primer consists of three parts: A, B and C. Part A is the base, Part B is the curing agent, and Part C is the special diluent.

Excellent heat resistance for long-term use below 180 °C after curing;

Excellent adhesion and compatibility for good bonding with most substrates, such as concrete, acid-resistant brick, steel substrate, as well as Guibao elastic anti-corrosion material, so that the bonding strength between the substrate and the elastic anti-corrosion material could be greatly improved;

Good sealing effect on the substrate to prevent the adhesion of the anti-corrosion material due to alkali efflorescence and substrate moisture, so as to ensure the stability and reliability of the entire anti-corrosion system;

Excellent corrosion resistance for long-lasting use in the wet flue gas environment of power plant desulfurization chimney;

Usage of site and time not limited by the environment, and the coating can be cured at normal temperature and high temperature.

 

Main Usage

 

Bottom sealing for the facilities and equipment with the anti-corrosion systems in the thermal power plant;

Base layer sealing for the beacon paint on the outer wall of the chimney in the thermal power plant;

Anti-corrosion of steel structure, pips, boiler, machinery, etc.;

Anti-corrosion and decoration of high-temperature equipment, such as heating equipment, ovens and lighting equipment.

 

 

Typical Technical Indicators (the measured values should not be considered as product standards)

Sr.No.

Performance

Technical Indicator

1

Theoretical coating area and film thickness

4 to 6 m2/kg, film thickness 80 ~100 μm

2

Tack-free time, h(23±2℃)

Not sticky in 4h

3

(MPa)

Bond shear strength (MPa)

With concrete

                      ≧1

With steel

                      ≧2
4

Heat resistance (150 ° C × 1 h, cooling)

No change in surface

5

Diluent dosage

               5%~15%

Notes:

Mixing ratio of Part A and Part B (mass ratio) = 10:1

Theoretical coating area: refers to the primer consumption without considering the impact of coating environment, coating method, coating technique, surface condition, structure, shape and surface area during the actual construction.

 

Application Method

 

Before application, the surface of the substrate should be polished, dedusted and cleaned to avoid affecting the bonding;

Thoroughly stir Part A until there is no sediment at the bottom of the pail, and then add Part B &C (special diluent) according to the manufacturer's recommended ratio for full mixing;

Use it after about 15 minutes of curing.

 

Color

 

Part A is iron red, and Part B is colorless transparent liquid; after mixing, it is iron red liquid.

 

Packing

 

Part A as 20kg/kit, Part B as 2 kg/kit, diluent as15kg/kit;

Recommended mixing ratio: A: B = 10:1 (mass ratio)

 

 

Storage

 

Store in a cool, ventilated and dry place . From the date of production, the storage period is 12 months in the unopened &sealed container.

 

Transportation

 

Transported as non-dangerous goods

 

Precautions

 

Not suitable for frosted or wet substrate surfaces;

When the substrate temperature is lower than 5 °C and the relative humidity is higher than 85%, it is not suitable for application;

Part A & B should be thoroughly mixed to avoid unevenness and affect the performance of primer;

Part A&B should be stored separately, and prepared when using; after preparation, it should be used within the applicable period, otherwise it will lead to aggregation and deterioration;

After the coating is completed, it must be self-cured for 7 days before putting into service. If the ambient temperature is lower than 10 °C, the curing time should be extended appropriately;

Protective measures should be taken before the coating is cured to avoid the scouring of rainwater and other liquids or the stepping of people.

 

Safety Instructions

 

Spark and open flame is forbidden at the application site. Workers are forbidden to carry fire and other items that are prone to spark or static electricity, do not wear spikes, high heels, chemical fiber overalls, and use explosion-proof electrical appliances and switch box lighting.

The application site should be well ventilated, and workers should wear labor protection products to prevent skin infection or discomfort caused by prolonged exposure to paint or solvent;

If inadvertently in contact with skin, wash with suitable detergent or soap. In case of eyes contact, rinse with plenty of water and seek medical advice immediately. If the workers feel uncomfortable, they shall be immediately transferred to the fresh air place, and timely seek medical treatment if necessary.